SOUTH MAIN SEGMENT:
The South Main Street portion extends from the
southern end of the Downtown Segment south to the
approximate southern boundary of the Chamber of
Commerce parking lot.
Disclaimer:
All improvements and designs as specified in
these pages are conceptual in nature, and may be
modified and/or changed when actually built or
installed. No changes will be made to any
property shown on this page without the willing
consent and approval of the owner of that
property. All costs estimated in these pages
are based on 2006 dollars.

|
1. |
Renovated parking lot |
4. |
Seating / viewing area |
|
2. |
Screened dumpster enclosure |
5. |
Picnic area |
|
3. |
Observation platform / seating area |
|
|
Trail Length: Approximately 557 LF
Trail Material Composition: Crushed Stone/Asphalt
Key Trail Elements:
Seating/viewing
areas
• Crushed
stone or woodchip base
• Two benches
per area – Riverwalk typical style benches
•
Locations will provide for views to the river
Observation
platform/seating area
• Attach new
railing to existing concrete pad to provide safety
and aesthetics
• Define
access and enhance safety with split rail fencing
and landscaping
• Two
benches

Concrete pad proposed for observation
platform/seating area
Picnic area
• Picnic
table
• Decorative
landscaping
•
Locate to maximize aesthetic views to the river
Redesigned
parking lot behind building at 250 S. Main Street
• Improved
and defined vehicular circulation
• Landscape
islands to provide shade trees and aesthetic
interest
•
Provide gated vinyl-panel dumpster enclosure for
screening of two existing dumpsters

Parking lot behind building at 250 S. Main Street
Landscaping
throughout South Main Street Segment
• Trees,
shrubs and split-rail fencing
• Define
trail boundaries
• Provide
screening
• Provide
visual separation from private properties
• Define and enhance views
|
Estimated
Project Costs for Library Segment: |
| |
Installation
of crushed limestone trail: |
$ 4,500 |
| |
Asphalt
parking lot renovation |
$ 16,000 |
| |
Installation
of dumpster enclosure |
$ 6,000 |
| |
Clearing and
grubbing: |
$ 5,000 |
| |
Landscaping: |
$ 15,000 |
| |
Renovation of
fishing platform: |
$ 6,000 |
| |
Installation
of seating areas (2): |
$ 8,000 |
| |
Installation
of picnic area: |
$ 2,500 |
| |
Design &
Engineering |
$ 15,000 |
| |
|
|
| |
Subtotal: |
$ 78,000 |
| |
5%
Contingency: |
$ 3,900 |
| |
Total: |
$ 81,900 |
Disclaimer:
All improvements and designs as specified in
these pages are conceptual in nature, and may be
modified and/or changed when actually built or
installed. No changes will be made to any
property shown on this page without the willing
consent and approval of the owner of that
property. All costs estimated in these pages
are based on 2006 dollars.
Copyright © 2006 Thiensville-Mequon Rotary
Foundation Inc.
All rights reserved. All Copyrights and Trademarks
are the property of their respective owners.
These pages designed and maintained free by T-M
Rotarian
Return Home
|
|