THIENSVILLE MILL SEGMENT:
The Thiensville Mill portion of Rotary Riverwalk
extends from the publicly owned Thiensville Village
Park western boundary in a southerly direction to
the northern boundary of Molyneux Park in the
Village of Thiensville.
Disclaimer:
All improvements and designs as specified in
these pages are conceptual in nature, and may be
modified and/or changed when actually built or
installed. No changes will be made to any
property shown on this page without the willing
consent and approval of the owner of that
property. All costs estimated in these pages
are based on 2006 dollars.

|
1. |
Elevated Boardwalk attached to building |
7. |
Pedestrian bridge |
|
2. |
Dumpster Screening |
8. |
2-level elevated boardwalk over river |
|
3. |
Reconfigure Deck / Patio |
9. |
General park-like improvements |
|
4. |
Elevated boardwalk attached to existing deck |
10. |
Upgrade / replace existing bridge |
|
5. |
Steps for grade drop |
11. |
Picnic area |
|
6. |
Landscape privacy screen and general site
improvement |
12. |
Transition to existing crushed stone trail |
Trail Length:
Approximately 994 LF
Trail Material Composition: Boardwalk/Hard Surface
Key Trail Elements:
Elevated
boardwalk
From Molyneux Park to parking lot north of 140
S. Main Street
Attach to rear of building at 140 S. Main Street
Runs along edge of river above ordinary high
water mark
Permanent structure - construct of wood or
recycled plastic
Combine with hard and soft riverbank
stabilization measures to preserve shoreline and
provide aesthetic interest

Building at 140 S. Main Street where boardwalk
will be required
Parking lot
renovation between 140 and 130 S. Main Street
Create trail easement along eastern edge of
existing parking lot
Buffer trail from parking lot with landscaping
and fencing
Use tall landscaping to create visual screen for
loading dock
Provide gated vinyl-panel dumpster enclosure for
screening of two existing dumpsters

Parking lot between 140 and 130 S. Main Street
Reconfigured
deck/patio behind 130 S. Main Street
Create elevated boardwalk to tie into surface
trail along parking lot to the south
Provide secure gated access from boardwalk to
deck
Stairway necessary to account for grade change
from boardwalk to property at 120 S. Main Street

Deck behind building at 130 S. Main Street
Property at 120
S. Main Street
Provide general site improvements to property
Create privacy barrier with landscaping and
fencing
Trail will be hard surface material
Prefabricated
pedestrian bridge
Bridge will span the Pigeon Creek tributary of
the Milwaukee River
Bridge style to compliment that of bridge at
Library Segment

Pigeon Creek confluence with the Milwaukee River
Elevated
boardwalk
From north side of bridge to Thiensville Mill
Incorporate existing boardwalk behind building
at 118 Green Bay Road
Permanent structure - construct of wood or
recycled plastic
Two levels - Lower level just above ordinary
high water mark, at low end of existing wall -
Upper level at same grade as top of riverbank
Staircase at Mill to connect two boardwalk
levels together

Boardwalk behind building at 118 Green Bay Road
Open space at
Thiensville sign overlook
Provide park-like improvements to property
Create seating and viewing areas to maximize
views to the river
Provide access to Riverwalk from sidewalk along
Green Bay Road

Thiensville sign overlook
Renovate picnic
area behind Mill
Upgrade/replace existing bridge and abutments
over mill race outfall
Create hard surface trail connections to bridge
Locate picnic/seating areas to maximize views to
the River

Bridge and proposed picnic area behind Thiensville
Mill building
Ultimate
Connection to existing Thiensville Park Segment
Create hard surface trail with handrail along
top of riverbank behind the property east of the
Mill
Transition to a crushed stone trail to meet up
with existing crushed stone trail
Landscaping
throughout Thiensville Mill Segment
Trees, shrubs and split-rail fencing
Define trail boundaries
Provide screening
Provide visual separation from private
properties
Define and enhance views
|
Estimated
Project Costs for Thiensville Mill Segment: |
|
|
Installation of
hard surface trail: |
$ 5,000 |
|
|
Asphalt parking
lot renovation |
$ 16,000 |
|
|
Installation of
dumpster enclosure |
$ 6,000 |
|
|
Clearing and
grubbing: |
$ 5,000 |
| |
Installation of
elevated boardwalk: (Park to 140 S. Main St.) |
$ 30,000 |
| |
Installation of
elevated boardwalk: (Behind 130 S. Main St.) |
$ 20,000 |
|
|
Installation of
elevated boardwalk: (Bridge to Mill) |
$ 180,000 |
|
|
Riverbank
stabilization measures: |
$ 30,000 |
|
|
Installation of
pedestrian bridge (includes abutments): |
$ 40,000 |
|
|
Upgrade/replace
bridge over mill race outfall: |
$ 25,000 |
|
|
Landscaping: |
$ 58,000 |
|
|
Renovation of
picnic/seating area: |
$ 5,000 |
|
|
Design &
Engineering |
$ 38,000 |
|
|
|
|
|
|
Subtotal: |
$ 458,000 |
|
|
5% Contingency: |
$ 22,900 |
|
|
Total: |
$
480,900 |
Disclaimer:
All improvements and designs as specified in
these pages are conceptual in nature, and may be
modified and/or changed when actually built or
installed. No changes will be made to any
property shown on this page without the willing
consent and approval of the owner of that
property. All costs estimated in these pages
are based on 2006 dollars.
Copyright © 2006 Thiensville-Mequon Rotary
Foundation Inc.
All rights reserved. All Copyrights and Trademarks
are the property of their respective owners.
These pages designed and maintained free by T-M
Rotarian
Return Home
|