A Joint Centennial Project of the Rotary Clubs of |
|
Thiensville and Mequon,
Wisconsin, USA, |
|
Rotary District 6270 |
DOWNTOWN SEGMENT:
The Downtown portion of Rotary Riverwalk extends
from the northern boundary of Molyneux Park
southerly to the approximate southern boundary of
Fiddleheads.
Disclaimer:
All improvements and designs as specified in
these pages are conceptual in nature, and may be
modified and/or changed when actually built or
installed. No changes will be made to any
property shown on this page without the willing
consent and approval of the owner of that
property. All costs estimated in these pages
are based on 2006 dollars.

|
1. |
Parking lot renovation |
5. |
Molyneux Park canoe launch |
|
2. |
Outdoor picnic / seating area |
6. |
Molyneux Park seating / viewing area |
|
3. |
Elevated boardwalk |
7. |
Molyneux Park public parking |
|
4. |
Dumpster screening |
|
|
Trail Length: Approximately 606 LF
Trail Material Composition: Crushed
Stone/Boardwalk
Key Trail Elements:
Parking lot
renovation behind 192 S. Main Street
Improve
vehicle circulation
Landscape barrier to separate parking from trail
Outdoor
seating/picnic area behind 192 S. Main Street
Renovate
existing picnic area
Connect trail to existing sidewalk behind building
Parking lot
renovation between 192 and 190 S. Main Street
Create
trail easement along eastern edge of existing
parking lot
Buffer trail from parking lot with landscaping and
fencing

Parking lot between 192 and 190 S. Main Street
Provide gated
vinyl-panel dumpster enclosure behind 178 and 180
S. Main Street
Compliment enclosure with landscaping to give
screening a more natural appearance
Elevated
boardwalk
From 190 S.
Main Street to Molyneux Park
Necessary
because of the close proximity of the rear of the
buildings to the waters edge - does not provide
for a flat enough area along the riverbank to
implement a trail
Construct
of wood or recycled plastic
42 minimum
height handrails to provide safety
Boardwalk would attach to back of structures at
180 and 178 S. Main Street

Behind buildings along South Main Street where
boardwalk will be required
Molyneux Park
Connect to
existing walk through park
Access to
carry-in canoe launch
Existing
seating and picnic areas
Existing public parking

Molyneux Park
Landscaping
throughout Downtown Segment
Trees,
shrubs and split-rail fencing
Define
trail boundaries
Provide
screening
Provide
visual separation from private properties
Define and enhance views

Molyneux Park
|
Estimated Project Costs
for Downtown Segment: |
| |
Installation of hard surface trail:
|
$ 5,000 |
| |
Asphalt
parking lot renovation |
$ 16,000 |
| |
Installation of dumpster enclosure |
$ 6,000 |
| |
Clearing
and grubbing: |
$ 5,000 |
| |
Installation of elevated boardwalk: |
$ 100,000 |
| |
Riverbank
stabilization measures: |
$ 30,000 |
| |
Landscaping: |
$ 15,000 |
| |
Installation of picnic/seating area: |
$ 6,000 |
| |
Design
& Engineering |
$ 24,000 |
| |
|
|
| |
Subtotal: |
$ 207,000 |
| |
5%
Contingency: |
$ 10,350 |
| |
Total: |
$ 217,350 |
Disclaimer:
All improvements and designs as specified in
these pages are conceptual in nature, and may be
modified and/or changed when actually built or
installed. No changes will be made to any
property shown on this page without the willing
consent and approval of the owner of that
property. All costs estimated in these pages
are based on 2006 dollars.
Copyright © 2006 Thiensville-Mequon Rotary
Foundation Inc.
All rights reserved. All Copyrights and Trademarks
are the property of their respective owners.